Construction of Administration Room at SMP Negeri 20 Mukomuko: Implementation of Project Management and Budget Planning

Authors

  • Siti Hartati CV. karya kreasi konsultan, Bengkulu, Indonesia Author

Keywords:

school construction, administration room, budget plan, educational building construction, project management

Abstract

The construction of the Administration Room at SMP Negeri 20 Mukomuko is a strategic project aimed at improving educational facilities and infrastructure. This project aims to provide representative, safe, and comfortable administrative facilities to replace the old building that is no longer suitable for use. The implementation method begins with the preparation of the Budget Plan (RAB), architectural design and working drawings, site preparation, through to phased construction execution. The total construction cost is IDR 540,126,850 with an implementation period of 90 calendar days. The building is a single-story structure with stone foundations, K-225 grade reinforced concrete structure, red brick walls, lightweight steel roof, ceramic flooring, and gypsum ceiling. Implementation includes seven main stages: preparation, foundation, concrete structure, walls and finishing, roof and frames, electrical-sanitary installation, and furniture. The implementation results show 100% compliance with the RAB and working drawings, completed on time without cost overruns. This new building successfully improves administrative work efficiency, staff comfort, and school image. This project serves as an example of good governance implementation in the development of efficient, quality, and sustainable educational infrastructure

Downloads

Download data is not yet available.

Downloads

Published

2025-12-11