Construction Of Computer Laboratory: The Embodiment Of Digital Transformation In Education At Smp Negeri 02 Mukomuko
Keywords:
Computer Laboratory, Construction, SMP Negeri 02 Mukomuko, Civil Engineering, ArchitectureAbstract
The Construction of the Computer Laboratory Room at SMP Negeri 02 Mukomuko is a strategic project aimed at supporting digital transformation in secondary education. This report discusses architectural planning, construction methodology, and interim results, with project progress reaching 85%. Primary data were obtained from the Bill of Quantities (BoQ) and architectural drawings. The analysis was conducted using civil engineering approaches, considering compliance with Indonesian National Standards (SNI) and cost efficiency principles. The findings indicate that the reinforced concrete structure with an approximate area of 108 m² meets the functional and safety requirements for a school laboratory. Overall, the project has proceeded according to schedule and expected quality.











