Analysis Of The Influence Of Internal And External Factors of The Project on The Quality Of The Talang Durian – Pondok Uden Road Construction Project
Keywords:
Project Quality, Internal Factors, External Factors, Road Construction, Multiple Linear RegressionAbstract
This study aims to analyze the influence of internal and external project factors on the quality of the Talang Durian – Pondok Uden Road construction project. The research method used was multiple linear regression analysis with a total sampling technique, with 33 respondents directly involved in the project implementation. The results showed that partially, the technology/equipment variable had no significant effect on the quality of the construction project, with a significance value of 0.527. The materials variable had a positive and significant effect on project quality, with a significance value of 0.010 and a coefficient of 0.324. Human resources also had a positive and significant effect, with a significance value of 0.000 and a coefficient of 0.393. The work method variable showed a positive and significant effect, with a significance value of 0.021 and a coefficient of 0.224. Finance had a positive and significant effect on project quality, with a significance value of 0.003 and a coefficient of 0.415. Meanwhile, external factors had no significant effect partially, with a significance value of 0.176. However, simultaneously, the six independent variables significantly influenced construction project quality, with an F-value of 142.365 and a significance level of 0.000. The coefficient of determination (R²) of 0.970 indicates that 97% of the variation in project quality can be explained by the variables in the model, while the remaining 3% is influenced by factors outside this study











